Systems integration: fire alarm, access control and CCTV

High-level interfaces that bring life-safety and security systems into the BMS, with alarms and cause-and-effect visible to operators.

S-06 / 01

Overview

Fire alarm, access control and CCTV are usually installed by specialists and left on their own screens. We bring them into the BMS through high-level interfaces, so operators see life-safety and security events in context, and cause-and-effect between systems works as designed.

S-06 · SYNEX

Scope of work

  • Integration design and interface matrix between systems
  • High-level interfaces to fire alarm panels (BACnet, Modbus or vendor gateways)
  • Access control and intrusion events in the BMS
  • CCTV integration: camera call-up on alarm
  • Lift, generator, UPS and packaged plant monitoring
  • Cause-and-effect testing across systems

Deliverables

  1. 01Interface matrix and points mapping
  2. 02Coordination records with each system supplier
  3. 03Configured gateways and graphics
  4. 04Integrated cause-and-effect test sheets
  5. 05As-built integration documents

Protocols and technologies

  • BACnet
  • Modbus
  • OPC
  • SNMP
  • ONVIF
  • Vendor SDK/gateways

Typical applications

  • Hospitals and critical facilities
  • Commercial towers
  • Hotels
  • Data centers

How we deliver it

  1. 1

    01

    Survey

    We walk the site, review drawings and the BOQ, and agree what the system must do before anything is priced.

  2. 2

    02

    Design

    System architecture, points list, controllers and network, sized to the real equipment and the consultant's specification.

  3. 3

    03

    Engineering & submittals

    Shop drawings, panel layouts, wiring diagrams, sequences of operation and data sheets, submitted as one complete package.

  4. 4

    04

    Supply & installation

    Controllers, field devices and panels supplied to the approved submittal, installed and terminated under our supervision.

  5. 5

    05

    Programming & integration

    Sequences, graphics, alarms, trends and third-party interfaces are programmed and tested in-house before we reach site.

  6. 6

    06

    Testing & commissioning

    Point-to-point checks, functional tests and witnessed commissioning, with every result recorded.

  7. 7

    07

    Handover & support

    As-built documents, backups and operator training, followed by maintenance and support contracts.

RFQ · SYNEX

Discuss your project with an engineer

Share your drawings, BOQ or specification and we will reply with a clear scope and quotation.