Systems integration: fire alarm, access control and CCTV
High-level interfaces that bring life-safety and security systems into the BMS, with alarms and cause-and-effect visible to operators.
S-06 / 01
Overview
Fire alarm, access control and CCTV are usually installed by specialists and left on their own screens. We bring them into the BMS through high-level interfaces, so operators see life-safety and security events in context, and cause-and-effect between systems works as designed.

Scope of work
- Integration design and interface matrix between systems
- High-level interfaces to fire alarm panels (BACnet, Modbus or vendor gateways)
- Access control and intrusion events in the BMS
- CCTV integration: camera call-up on alarm
- Lift, generator, UPS and packaged plant monitoring
- Cause-and-effect testing across systems
Deliverables
- 01Interface matrix and points mapping
- 02Coordination records with each system supplier
- 03Configured gateways and graphics
- 04Integrated cause-and-effect test sheets
- 05As-built integration documents
Protocols and technologies
- BACnet
- Modbus
- OPC
- SNMP
- ONVIF
- Vendor SDK/gateways
Typical applications
- Hospitals and critical facilities
- Commercial towers
- Hotels
- Data centers
How we deliver it
- 1
01
Survey
We walk the site, review drawings and the BOQ, and agree what the system must do before anything is priced.
- 2
02
Design
System architecture, points list, controllers and network, sized to the real equipment and the consultant's specification.
- 3
03
Engineering & submittals
Shop drawings, panel layouts, wiring diagrams, sequences of operation and data sheets, submitted as one complete package.
- 4
04
Supply & installation
Controllers, field devices and panels supplied to the approved submittal, installed and terminated under our supervision.
- 5
05
Programming & integration
Sequences, graphics, alarms, trends and third-party interfaces are programmed and tested in-house before we reach site.
- 6
06
Testing & commissioning
Point-to-point checks, functional tests and witnessed commissioning, with every result recorded.
- 7
07
Handover & support
As-built documents, backups and operator training, followed by maintenance and support contracts.

RFQ · SYNEX
Discuss your project with an engineer
Share your drawings, BOQ or specification and we will reply with a clear scope and quotation.